Quick answer

Reroofing is the work of putting a new roof covering on a house that already has one, either by tearing the old covering off down to the deck (a replacement) or by laying the new covering over the old one (a recover, often called an overlay).

The International Residential Code covers both in Section R908. It says a replacement removes every layer down to the deck, and it bans an overlay when the old roof is wet or worn out, is slate or tile, or already has two layers.

Quick facts

Two kinds
Replacement (tear-off) and recover (overlay) 1
Code section
2021 IRC Section R908, Reroofing 1
Replacement means
Removing all layers down to the roof deck 1
Overlay banned when
Roof is water soaked or worn out, is slate or tile, or has two or more layers 1
Layer limit
No more than two layers when the job is done (typical local rule) 4
Old flashing
Must be replaced if rusted, damaged or worn out 1
Permit
Usually required, with a final roof inspection 4

Key takeaways

  • Reroofing is any job that puts a new covering on a roof that already has one.
  • A tear-off removes every old layer down to the deck. An overlay (recover) lays new shingles over the old ones.
  • The 2021 IRC bans an overlay if the old roof is wet or worn out, is slate or tile, or already has two layers.
  • A tear-off lets the crew see and fix the deck. An overlay hides it.
  • Most reroofs need a permit and a final inspection, and local rules can be stricter than the model code.

What reroofing means

Reroofing is the code's word for any job that puts a new covering on an existing roof. It is not the same as building a roof on a new house.

The house, the rafters and the roof deck are already there. What changes is the outer layer that keeps the weather out, plus the underlayment and flashing that go with it.

The 2021 International Residential Code, or IRC, splits reroofing into two kinds 1. A roof replacement removes the old roof covering.

The code says it "shall include the removal of existing layers of roof coverings down to the roof deck." Roofers call this a tear-off. A roof recover installs a new covering on top of the old one. Roofers call this an overlay, a layover or a roof-over.

The Asphalt Roofing Manufacturers Association, the trade group for shingle makers, uses the same two words.

It defines replacement as removing the old covering, repairing any damaged deck and installing a new covering, and recover as installing an extra covering on the existing one 2.

When a roofer says "reroof," ask which of the two they mean. The words are often used loosely, and the two jobs are very different.

How each method works

In a tear-off, the crew strips the shingles, the underlayment and usually the old flashing and drip edge off the roof. That leaves the bare deck, the sheets of plywood or boards nailed to the rafters.

The crew checks the deck, replaces soft or broken pieces, and then builds the roof back up layer by layer: drip edge, underlayment, an ice barrier where the climate calls for one, flashing, and then the new shingles.

In an overlay, the old shingles stay. The crew cleans the roof, takes off the old ridge and hip caps, and nails new shingles over the top.

The nails have to be longer, because they must pass through both layers and still bite into the deck.

IKO, a shingle maker, says nails must be long enough for firm anchorage and that the new ridge caps need even longer ones 3.

One local building guide asks for nails that go all the way through the roofing and at least ¾ inch into the deck 4.

IKO describes two ways to lay an overlay 3. In nesting, each new shingle is fitted against the edge of an old one, so the old pattern is hidden.

In bridging, the new shingles span over the old courses, which can let the old layer show through as ridges. Which method works depends on the shingle sizes, so the crew should test-fit before starting.

The kinds of reroofing work

The code names these cases in Section R908 1:

TypeWhat happensCode basis
Roof replacement (tear-off)All layers removed down to the deck, then a new roof built upR908.3
Roof recover (overlay)New covering installed over the existing coveringR908.3.1
Separate system over old roofA system such as standing-seam metal that carries its load straight to the framingR908.3.1, item 2
Metal or tile over wood shakeMetal panels, metal shingles, concrete or clay tile over an old shake roofR908.3.1, item 3, with R908.4
CoatingA new protective coating over an existing coating or certain low-slope roofsR908.3.1, item 4
Tile or slate relaySound old slate or tile taken up and put backR908.5

On most houses with asphalt shingles, the real choice is the first two rows: tear-off or overlay.

Worked example: can this roof take an overlay?

Here is how the code test plays out on three made-up houses. Each one has an asphalt shingle roof that needs work.

HouseWhat the roofer findsOverlay allowed?
AOne layer of flat three-tab shingles, dry and solid deck, no saggingUsually yes, if the new shingle maker's instructions allow it
BTwo layers of shingles already on the roofNo. R908.3.1.1 bans a recover over two or more layers
COne layer, but soft spots and stained deck boards seen from the atticNo. A water-soaked or worn-out base is not allowed

House A also has to pass the other checks: the framing must carry the extra weight 1, and many makers advise against laying new shingles over laminated (dimensional) shingles 2. These are illustrative houses, not real jobs.

Where reroofing comes up

Most homeowners meet the word reroofing in three places. The first is the permit. Many building departments list "reroof" as its own permit type, separate from new building work.

The second is the roofing quote, where the line items often say "tear-off" with a count of layers, or "recover." The third is an insurance claim, where the adjuster's estimate may include tear-off and disposal of each existing layer.

The word also shows up when a house is sold. An inspector may count the layers at the roof edge and note that a second layer is already in place.

That matters, because under the 2021 IRC a roof with two layers cannot take a third 1. The next reroof on that house must be a full tear-off.

Benefits of each method

  • Tear-off: the crew sees the whole deck and can replace rotted wood before it is covered.
  • Tear-off: new underlayment, ice barrier, drip edge and flashing go in, built to today's code.
  • Tear-off: the roof carries one layer of weight, not two, and the next reroof is simpler.
  • Overlay: less labor and less waste to haul away. ARMA notes the lower disposal cost 2.
  • Overlay: the old layer gives some extra backup protection, by ARMA's account 2.
  • Overlay: the house is open to weather for less time, since the deck is never bare.

Limits of an overlay

  • It hides the deck. Rot, soft spots and old leaks stay under the new roof where no one can see them.
  • It adds weight. The code requires the framing to carry the roof plus the loads during the work 1.
  • It can look lumpy. Curled or uneven old shingles show through the new layer.
  • It is not allowed over slate, clay, cement or asbestos-cement tile, or over two existing layers 1.
  • It may change product ratings. ARMA notes impact-resistance ratings may be affected by a recover 2.
  • It uses up the last allowed layer, so the next job must be a full tear-off.

What drives the cost of a reroof

We do not list prices here, because they vary by place and by month. These are the things that move a quote up or down. For a figure for your house, use the roof cost calculator or the roof cost guide.

  • Roof size, counted in roofing squares of 100 square feet each.
  • Number of layers to remove. Each extra layer means more labor and more waste to haul.
  • Deck repair. Rotted sheets found after the tear-off are often priced per sheet.
  • Steepness. A steeper roof pitch is slower and needs more safety gear.
  • Flashing and edge metal. Whether the old pieces are replaced or reused.
  • Permit and disposal fees, which are set locally.
  • Material. Shingle grade, metal or tile.

How a tear-off reroof usually goes

This is what you should see, not a do-it-yourself guide. The full project timeline is on how a roofing project works. Roof work is a fall risk.

Federal rules say workers on an edge 6 feet or more above a lower level must be protected by guardrails, nets or a personal fall arrest system 5.

  1. The roofer inspects the roof and the attic and counts the layers.
  2. The roofer or owner gets the reroof permit from the building department.
  3. The crew tarps the yard and strips the old roofing down to the deck.
  4. Soft, warped or cracked deck boards are repaired or replaced. Some towns inspect the deck at this point.
  5. Drip edge, underlayment and, where required, an ice barrier go down.
  6. Flashing is rebuilt and the new covering is installed.
  7. The site is cleaned and the building department does a final roof inspection.

Care after a reroof

  • Keep the permit, final inspection record and the list of layers removed. Buyers and insurers may ask.
  • Ask for photos of the bare deck and any repairs made before they were covered.
  • Check the attic after the first heavy rain for drips or stains near vents and chimneys.
  • Keep gutters clear so water leaves the new roof edge.
  • Look at the roof from the ground after big storms for lifted or missing shingles.
  • Write down whether the roof is one layer or two. It decides what the next reroof can be.

Risks to watch for

  • Hidden rot under an overlay. A soft deck holds nails poorly, and ARMA says the deck must allow good fastener hold 2.
  • Too much weight. ARMA lists sagging along the ridge or between trusses as a reason to tear off 2.
  • Reused flashing that fails. The code says rusted, damaged or worn flashing, vents and edging must be replaced 1.
  • A layer count above the limit. A third layer can fail inspection and may need to be torn off.
  • Trapped moisture. IKO says the roof should be fully dry before an overlay 3.
  • Poor ventilation. ARMA and IKO both say to check attic airflow during a reroof 2 3.

What the code says about reroofing

These rules are from Section R908 of the 2021 International Residential Code, read in the Maryland adoption 1. States and cities adopt the IRC on their own schedule and can amend it.

2021 IRC Section R908, Reroofing
SectionWhat it requires
R908.1 GeneralNew coverings, whether recovering or replacing, must meet Chapter 9. Roofs with positive drainage need not meet the ¼-inch-per-foot minimum slope or add secondary drains.
R908.2 LoadsThe roof framing must carry the new roof system and the material and equipment loads during installation.
R908.3 ReplacementRemove existing layers down to the deck. An ice barrier stuck to the deck may stay and be covered with a new ice barrier layer.
R908.3.1 Recover allowedWhere the new covering maker's instructions allow it; for separate systems like standing-seam metal; for metal or tile over wood shake; for certain coatings.
R908.3.1.1 Recover not allowedIf the old roof is water soaked or too worn to be a base; if it is slate, clay, cement or asbestos-cement tile; or if it has two or more layers of any covering.
R908.4 Over wood shakeIf a new covering over wood shingles or shakes leaves a hidden combustible space, the old surface must be covered with gypsum board, mineral fiber, glass fiber or another approved material.
R908.5 Reusing materialsSound slate, clay or cement tile may be put back; cracked or broken pieces may not. Rusted, damaged or worn flashing, edging, vents and outlets must be replaced. Gravel surfacing may not be reused.
R908.6 FlashingsFlashing is rebuilt to the maker's instructions. Metal that will have asphalt materials stuck to it must be primed first.

Sources: [1]

Tear-off vs overlay vs repair

Tear-off (replacement)Overlay (recover)Repair
What is removedAll layers to the deckRidge and hip caps onlyOnly the damaged area
Deck checkedYes, all of itNoOnly near the repair
New underlayment and flashingYesFlashing rebuilt; old underlayment staysOnly where worked
Layers when doneOneTwoSame as before
Allowed over two layersYes, it removes themNo 1Yes
Allowed over slate or tileYesNo 1Yes, with matching units
Best forWorn, wet or multi-layer roofsOne flat, dry layer on a sound deckSmall, local damage

Not sure whether you need a repair or a new roof? See repair or replace.

Common misconceptions

Myth You can always add another layer.
Reality The 2021 IRC bans a recover over two or more existing layers, so a third layer is not allowed 1.
Myth An overlay is a full new roof.
Reality It is a new top layer. The old shingles, underlayment and deck stay in place, unseen.
Myth Reroofing and roof replacement mean the same thing.
Reality Replacement is one kind of reroofing. A recover is the other kind.
Myth Old flashing is always fine to reuse.
Reality The code requires rusted, damaged or worn flashing and vents to be replaced 1.
Myth Any roof can take an overlay.
Reality Slate, clay, cement and asbestos-cement tile roofs cannot be recovered under R908.3.1.1 1.
Myth Two layers are always legal everywhere.
Reality Two is the limit in many places, but local rules can be stricter. Some towns require a full tear-off.

Local rules for reroofing

The rules on this page come from the 2021 IRC. Your state or city may use an older or newer edition, and may amend it. That is why the same overlay can be fine in one town and turned down in the next.

Local building guides show how this plays out.

The East Point, Georgia, reroof guide, based on the 2018 IRC, says a permit is needed, that "no more than two (2) layers are allowed upon completion of installation," that the owner must call for a final roof inspection, and that a mid-roof inspection may be required 4.

It also says warped, cracked or split deck boards must be repaired or replaced on a full tear-off, and that worn or rusted roof jacks and vents must be replaced.

In cold areas the code also calls for an ice barrier at the eaves, and on a tear-off that is put in fresh. Ask your building department, or your roofer, which code edition applies, whether a reroof permit is needed, and which inspections they do.

How to choose: tear-off or overlay

  • Count the layers first. Two or more means tear-off, with no choice.
  • Is the roof slate or tile? Then it cannot be recovered. It is a tear-off or a relay of sound units.
  • Any soft spots, sagging, leaks or stained deck in the attic? ARMA says remove the old roof 2.
  • Are the old shingles curled or badly uneven? An overlay will show it. IKO says avoid an overlay over curling shingles 3.
  • Is the old roof laminated shingles? Many makers do not recommend an overlay over them 2.
  • Does the new shingle maker's instructions allow an overlay, and does the warranty still apply? Ask in writing.
  • If all of that checks out, an overlay may be allowed. Otherwise, plan a roof replacement.
Decision guide Tear-off or overlay: what the 2021 IRC decides
If The roof is wet or worn out as a base
Then Tear-off. A recover is not allowed 1.
If The roof is slate, clay, cement or asbestos-cement tile
Then Tear-off. A recover is not allowed 1.
If There are already two or more roof coverings
Then Tear-off. A recover is not allowed 1.
If None of these apply, and the new shingle maker allows it
Then An overlay may be allowed. Confirm with your building department.

2021 IRC R908.3.1.1. Local adoption and amendments vary. Source: [1]

The guide shows that the code settles most cases; only the last row is a real choice.

Keep going

Questions about reroofing

What is the difference between reroofing and roof replacement?

Roof replacement is one kind of reroofing. Reroofing means any job that puts a new covering on an existing roof. A replacement tears all the old layers off down to the deck first. The other kind, a recover or overlay, lays new shingles over the old ones. The 2021 IRC covers both in Section R908.

Can you put new shingles over old shingles?

Sometimes, if the code and the shingle maker allow it. Under the 2021 IRC, an overlay is banned if the old roof is water soaked or worn out, is slate or tile, or already has two layers. The framing must also carry the extra weight. Many makers advise against laying over laminated shingles.

How many layers of shingles are allowed on a roof?

Usually two at most. The 2021 IRC does not allow a recover over a roof that already has two or more layers, so a third layer is not allowed.

Many local guides say no more than two layers when the job is done. Local amendments can be stricter, so ask your building department whether an overlay is allowed at all.

Is a tear-off better than an overlay?

In most cases a tear-off gives a better roof, because the crew can see and fix the deck and put in new underlayment and flashing.

An overlay costs less in labor and disposal and is faster. It only makes sense on one flat, dry layer over a solid deck, where the code and maker allow it.

Do you need a permit to reroof a house?

In most places, yes. Many building departments list reroofing as its own permit type and require a final roof inspection, and some add a deck or mid-roof inspection. Rules vary by city and county, so check with your local building department before work starts, or ask your roofer to pull the permit.

Can old flashing be reused when reroofing?

Only if it is still sound. Section R908.5 of the 2021 IRC says existing flashing, edging, vents and similar parts must be replaced where they are rusted, damaged or worn out. R908.6 says flashing is rebuilt to the maker's instructions. On a tear-off, most roofers replace it anyway.

Can you overlay a tile or slate roof?

No. Section R908.3.1.1 of the 2021 IRC bans a recover over slate, clay tile, cement tile or asbestos-cement tile. Those roofs must be torn off, or the sound tiles and slates can be taken up and put back. Cracked or broken pieces may not be reused under R908.5.

Does a roof overlay void the shingle warranty?

It can, so check before you agree to one. The code allows a recover only where the new shingle maker's instructions allow it. Makers set their own rules for overlays, and some do not recommend going over certain shingles. Ask your roofer for the maker's written terms for an overlay.

Do you have to remove the ice barrier when reroofing?

Not always. Section R908.3 of the 2021 IRC lets an existing ice barrier that is stuck to the deck stay in place, as long as it is covered with a new ice barrier layer. The rest of the old roof still comes off down to the deck in a replacement.

What does a roofer check before an overlay?

The roofer should count the layers, look for soft or sagging areas, check the attic for stains or rot, and see whether the old shingles lie flat. ARMA also says to confirm the framing can carry another layer and that the deck holds nails well. Attic ventilation should be checked too.

Sources

  1. International Code Council, 2021 International Residential Code §R908 Reroofing (Maryland adoption, read at UpCodes), retrieved .
  2. Asphalt Roofing Manufacturers Association, "Asphalt Shingle Reroofing: Replacement vs. Recover" (Feb 22, 2024), retrieved .
  3. IKO, "Reroofing an existing shingle roof", retrieved .
  4. City of East Point, Georgia, "2018 IRC Building Guide: Residential Re-Roof", retrieved .
  5. OSHA, 29 CFR 1926.501(b) Duty to have fall protection (read at Cornell LII), retrieved .

Expert review

Written by the HyreRoof editorial team. Not yet reviewed by an outside expert. We say so rather than imply a review that has not happened; see our editorial policy.

How the numbers were checked: Section R908 read verbatim in the 2021 IRC as adopted in Maryland; overlay guidance from ARMA and IKO; local permit rules from one city guide, labelled as that city's.

Suggest a correction. We fix errors and say what changed.