Going over the old roof
A layover hides the deck so nothing underneath can be inspected or repaired, adds weight, and typically shortens the life of the new covering. It also guarantees a full tear-off next time, at that future price.
Roofing services
A replacement removes the existing covering, exposes and repairs the deck, and installs a complete new roofing system: underlayment, ice barrier where required, flashing, the covering itself and the ventilation that decides how long it lasts. The covering is the part you are shown. The system underneath is what keeps water out.
HyreRoof does not repair, replace or inspect roofs. This page explains the work so you can judge a quote and a contractor.
The short version
Any one of these on its own may not decide it. Several together usually do.
Landscaping, driveway and anything under the eaves. Ask where the dumpster sits and what happens to the lawn.
Down to the deck. This is where a layover would have hidden everything that follows.
Soft or delaminated sheathing is cut out and replaced, priced per sheet at the rate agreed before the roof was opened.
Ice barrier at eaves and valleys where local history or code requires it. This is a line that quotes quietly differ on.
Drip edge, step flashing at sidewalls, kick-out at wall terminations, valley metal, chimney and skylight flashing. Replaced, not reused.
Starter course, field, hip and ridge, to the manufacturer’s fastening pattern. Nail count, placement and depth are what wind finds first.
Ridge or other exhaust, balanced against intake at the soffit. Getting this wrong shortens the life of everything above it.
Magnet sweep for nails, gutters cleared of debris and granules, and a look at the finished details before the final payment.
The full comparison is on the materials guide. What matters at quote stage is that weight is a constraint, not a preference.
| Asphalt shingle | The default. Economical, any crew can service it, and available in impact-rated grades for hail country. |
|---|---|
| Metal | Longer service life, sheds snow well, performs in wildfire areas. Costs more and needs a crew that works in metal. |
| Tile | Very long life in hot, sunny climates. Heavy enough that the structure must be checked before it is an option. |
| Slate | The longest life in common use and the heaviest. A genuine specialist trade. |
| Cedar | Appearance-driven, needs maintenance, and fire classification matters in wildfire areas. |
| Low-slope membrane | TPO, EPDM or modified bitumen for flat and low-slope sections. A different trade with different failure modes. |
Two houses with identical footprints can differ by a factor of two once pitch, layers and access are counted.
| Factor | Why it changes the number |
|---|---|
| Roof area in squares | Measured on the roof surface. A 6:12 pitch adds roughly 12 per cent over the footprint before waste. |
| Pitch and walkability | Past roughly 7:12 the crew needs staging and fall protection. That is a step change in labour, not a gradual one. |
| Tear-off and layers | Labour plus dumpster. Two existing layers roughly doubles that work and the disposal volume. |
| Deck repair | Priced per sheet and discovered after tear-off. The single most common change order. |
| Material and grade | The covering plus underlayment, ice barrier, drip edge, starter and ridge. The accessories are not optional. |
| Complexity | Every valley, dormer, skylight and chimney adds flashing, cuts and time. |
| Access and site | Driveway distance, two storeys against one, landscaping to protect, and where the dumpster can sit. |
| Permit and local rules | Permit fee, inspection, and any local requirement such as an ice barrier line or wind uplift pattern. |
HyreRoof publishes no national average price for this work. Regional labour, disposal and material rates move it far enough that a single figure would mislead.
Comparing three quotes. Hand all three companies the same written scope, then compare line by line rather than total against total. Until all three state squares, layers removed, deck repair rate, accessories, flashing, ventilation and both warranty lengths, the cheapest is usually just the least complete.
The full ten-point checklist is on choosing a roofer.
A layover hides the deck so nothing underneath can be inspected or repaired, adds weight, and typically shortens the life of the new covering. It also guarantees a full tear-off next time, at that future price.
New covering over old flashing is the most common source of a leak on a roof that is otherwise new. Ask specifically which pieces are being replaced.
A new roof over a badly ventilated attic ages early. It is the most common reason a covering fails to reach its rating.
Without a per-sheet rate in writing, you negotiate deck repair with the roof already open and the crew on site.
A deposit that funds materials is normal. Most of the price before most of the work is not.
Three lump sums cannot be compared. The exclusions are the whole story, and they are not in the total.
Tear-off and installation on a typical single-family home is usually a matter of days, weather permitting. The longer part is what surrounds it: getting on the schedule, the permit, material lead times and the inspection afterwards. Deck damage found after tear-off is the most common reason a job runs past its quote.
There is no national answer worth acting on, and we deliberately do not publish one. The total is driven by area, pitch, how many layers come off, deck repairs found after tear-off, the covering and accessories, complexity, access and permit costs. Regional labour and disposal rates move the result far enough that a single figure misleads more than it helps.
Not usually, but someone should be reachable. Deck damage, unexpected flashing conditions and weather decisions all come up mid-job and need an answer. Agree in advance who authorises additional work and up to what amount, in writing.
Sometimes, and it is usually a false economy. Codes limit how many layers may be stacked, a layover hides the deck so nothing underneath can be inspected, it adds weight, and it typically shortens the life of the new covering.
Crews work in sections and dry the roof in at the end of each day, so an open deck is not usually left overnight. Your contract should say what happens if weather opens the roof and who carries the cost of resulting damage. Ask before you sign.
The manufacturer warrants the material against defects. The contractor warrants the installation. They are separate documents with separate lengths, and the majority of roof problems are installation problems, which the material warranty does not cover.
It depends on whether the roof is a deal-breaker or a negotiation item. An old roof can affect financing and insurability, which stops sales. A merely dated one usually becomes a price adjustment. A local agent and your buyer’s likely insurer will tell you more than a general rule.
Information on this page is general and may vary by location, building code, roof design, insurance policy and individual circumstances. It is not insurance, legal or engineering advice. HyreRoof is an independent roofing resource and connection platform, not a roofing contractor, and does not perform, supervise or warrant roofing work.
Tell us the project and the zip code. Free, and no obligation to hire anyone.