Quick answer
Torch-down roofing is a low-slope roof covering made of modified bitumen sheets, factory-made rolls of asphalt mixed with plastic or rubber, that a trained crew bonds to the roof by melting the back of each sheet with a propane torch.
The code calls it modified bitumen roofing (2021 IRC R905.11). Because it uses an open flame, fire codes treat it as hot work.
Quick facts
- Code family
- Modified bitumen roofing, 2021 IRC R905.11 1
- Minimum slope
- ¼ inch per foot (2 percent) 1
- Membrane standards listed
- ASTM D6162, D6163, D6164, D6222, D6223, D6298 1
- SBS sheet (polyester)
- ASTM D6164 2
- APP sheet (polyester)
- ASTM D6222 3
- Fire code
- Open-torch work falls under IFC Chapter 35, Welding and Other Hot Work 4
Key takeaways
- Torch-down roofing is modified bitumen sheet that is melted onto a nearly flat roof with a propane torch.
- The 2021 IRC covers it under modified bitumen roofing, R905.11, and asks for a slope of at least ¼ inch per foot.
- The sheets are made to ASTM standards; D6164 covers SBS sheets and D6222 covers APP sheets.
- Because it uses an open flame, fire codes treat the work as hot work, which can mean a permit and a fire watch.
- Most roof fires from torching start at flashings, edges and pipes, so many crews use flameless products at those spots.
What torch-down roofing is, in plain words
Picture a heavy roll of roofing about the thickness of a thick rug. The roll is asphalt that has been mixed with a polymer, a kind of plastic or rubber, and pressed around a fabric mat. That product is called modified bitumen. "Modified" means the polymer was added; "bitumen" is the roofing word for asphalt.
On a torch-down job, the roofer unrolls the sheet, heats its underside with a wide propane torch until the asphalt melts, and presses it down.
As it cools, it bonds to the layer below and to the edge of the next sheet.
The seams are melted together the same way, so the finished roof acts like one waterproof skin.
The technical version: the 2021 International Residential Code groups these products under modified bitumen roofing in section R905.11 1. The code says nothing about the torch itself.
It only says the roof must follow that section and the maker's installation instructions. The torch is a way of applying the sheet, not a separate kind of roof.
How torch-down roofing keeps water out
A low-slope roof cannot rely on gravity and overlapping shingles the way a steep roof does. Water moves slowly and sometimes sits. So the roof has to be a continuous sheet with sealed seams, not a set of overlapping pieces.
Modified bitumen does that in layers, called plies. A base sheet goes down first, and a cap sheet goes on top. The code allows a base sheet that meets ASTM D1970, ASTM D4601 or IBC section 1507.11.2 under a modified bitumen cap sheet 1.
Each seam overlaps the one next to it, and the melted asphalt fuses the overlap. The polymer in the asphalt lets the sheet stretch and recover as the roof heats and cools, which plain asphalt does poorly.
The ASTM standards say the sheets are "intended for use in the fabrication of multiple ply roofing and waterproofing membranes" 2 3. In other words, the standard expects more than one ply.
- Cap sheetThe top ply, often with mineral granules that shield the asphalt from sun
- Base sheetThe first ply; the code lets it meet ASTM D1970 or D4601, or IBC 1507.11.2 1
- Cover board or insulationPer the maker's system; on wood decks a flameless layer is common
- Roof deckWood or concrete, sloped at least ¼ inch per foot 1
Bottom to top. Exact layers come from the manufacturer's system instructions, which the code says to follow 1.
SBS vs APP: the two main types of sheet
Modified bitumen sheets are named for the polymer mixed into the asphalt. The two you will see most are SBS and APP. The code lists both among the accepted membrane standards 1.
| SBS (styrene-butadiene-styrene) | APP (atactic polypropylene) | |
|---|---|---|
| What the polymer is | A rubber-like thermoplastic elastomer 2 | A plastic-like polymer 3 |
| ASTM standard (polyester mat) | D6164 | D6222 |
| Surface | With or without granules 2 | With or without granules 3 |
| Ways to apply | Torch, hot asphalt, cold adhesive or self-adhered, by the maker's system | Most often torch-applied; check the maker's system |
| Related standards | D6162 and D6163 (other SBS reinforcement) | D6223 (polyester plus glass reinforcement) |
Both ASTM standards say they are material specifications only. They set minimum properties for the sheet and leave roof design and application method to others 2 3. Ask which standard is printed on the rolls, not just "SBS" or "APP".
Worked example: checking a porch roof against the slope rule
A homeowner has a porch roof that is 12 feet deep from the wall to the gutter edge. The roofer measures a 2-inch drop across that depth. Is it steep enough for modified bitumen?
| Step | Math | Result |
|---|---|---|
| Drop per foot | 2 inches ÷ 12 feet | about 0.17 inch per foot |
| Code minimum for modified bitumen | ¼ inch per foot 1 | 0.25 inch per foot |
| Drop needed over 12 feet | 0.25 × 12 | 3 inches |
| Shortfall | 3 − 2 | 1 inch too flat |
Illustrative numbers. This roof would need tapered insulation or framing changes to reach the minimum before any modified bitumen goes on. Slope rules for every low-slope covering are on our low-slope roof page.
Where you will see torch-down on a house and on paper
- On the house: flat or nearly flat areas such as porch roofs, garage roofs, dormers, additions, row-house roofs and decks over living space.
- On a roofing quote: a line such as "2-ply SBS modified bitumen, torch-applied" or "APP cap sheet over base sheet". The number of plies and the application method should be written out.
- On a product data sheet: the ASTM standard number, such as D6164 or D6222, and whether the cap sheet is granule-surfaced or smooth 2 3.
- On a permit: the building permit for the roof, and in many places a separate fire permit for hot work. One New Jersey borough, for example, requires a fire permit before any roof torch work 8.
- On an insurance or job safety form: notes on fire watch, extinguishers and who on the crew holds torch training.
Benefits of torch-down roofing
- Seams are fused, not glued, so the finished roof acts as one continuous sheet over a surface where water moves slowly.
- Two plies give a backup layer; if the cap sheet is scuffed, the base sheet still stands between water and the deck.
- The sheets are made to named ASTM standards, so you can check what is going on your roof 2 3.
- Granule-surfaced cap sheets shield the asphalt from sunlight.
- No hot asphalt kettle is needed on site, unlike a built-up roof mopped in hot asphalt.
Limitations and trade-offs
- It brings an open flame onto your house. Fires can smolder under the surface after the torch is off 5.
- It is not allowed below ¼ inch per foot of slope under the 2021 IRC 1. Dead-flat roofs need to be built up first.
- Torching right at flashings, edges and roof penetrations is where most torch fires start, so those spots often need a flameless product instead 7.
- Open flame on a wood deck is a known risk. A Canadian roofing contractors' guideline says it "should also be avoided" on wood substrates 7.
- Quality depends heavily on the crew. Too little heat leaves weak seams; too much can damage the sheet or start a fire.
What drives the cost of a torch-down roof
We do not publish prices for torch-down roofing until we have enough sourced, dated quotes. These are the things that move the price; our roof cost calculator and cost guides help you size the job.
- Number of plies: one ply over a base sheet costs less than a full two-ply system.
- Tear-off: the 2021 IRC bars a recover over a roof that is water-soaked, deteriorated or already has two layers 1. Removing old layers adds labor and disposal.
- Slope fixes: tapered insulation or framing changes to reach ¼ inch per foot add material and time.
- Flameless details: self-adhered or cold-applied sheets at flashings and edges cost more than torching but lower fire risk 7.
- Fire safety: a hot work permit where required, a fire watch after torching and extra extinguishers all take crew time 4 8.
- Access and size: a small porch roof has a high setup cost per square foot; a big garage roof spreads it out.
What a professional torch-down install looks like
This is what you should expect to see, not a how-to. Torch work is hot work under the fire code and belongs to a licensed roofer with trained torch applicators. Do not attempt it yourself.
- The roofer pulls the building permit and, where your fire department requires one, a hot work or fire permit 8.
- The crew checks the roof for fire risks: wood decks, gaps at walls and pipes, and concealed attic spaces under the work 5.
- Old roofing is removed if the code bars a recover, and the deck is checked for rot and slope 1.
- Flashings, edges and penetrations are often done first with flameless products, carried about 3 feet into the field of the roof 7.
- The base sheet and cap sheet go down following the manufacturer's instructions, which the code makes binding 1.
- Extinguishers stay close to the torching. The CERTA program calls for two 4A60BC-rated extinguishers within 10 feet 5.
- A fire watch stays after the last torch is shut off. The model fire code text we read sets at least 30 minutes; CERTA training teaches two hours 4 5.
- PermitsBuilding permit, plus a hot work permit where the fire code requires one 4
- Site checkCombustible spots, pipes, and hidden spaces are reviewed before torching 5
- Details firstFlashings and edges often done flameless 7
- Base and cap sheetsLaid per the maker's system 1
- Fire watchCrew stays to watch for smoldering after the torch is off 4
Looking after a torch-down roof
- Keep drains, scuppers and gutters clear so water does not sit on the membrane. See roof ponding for what standing water does.
- Look from a window or ladder at the roof edge, not by walking on it, after big storms: check for lifted seams, blisters and bare spots where granules are gone.
- Keep foot traffic, furniture and grills off the surface unless the roof was built with walkway pads.
- Watch the flashings where the roof meets walls, chimneys and pipes. That is where small leaks usually start.
- Ask a roofer to inspect after any repair that involved a torch, and ask how they handled the fire watch.
Risks and warning signs
- Fire during install: the biggest risk, and the reason insurers pushed for torch training in 2003 after rising torch-related losses 5.
- Fire drawn into joints: flame can be pulled into gaps between materials at walls, edges and pipes 7.
- Blisters: raised bubbles under the cap sheet that can split and let water in.
- Open seams: edges of sheets that lift because they were under-heated or have aged.
- Ponding: standing water on a roof below the ¼-inch-per-foot minimum or with blocked drains 1.
- Leaks at flashings: the joint between the membrane and a wall or pipe is the weakest point on most low-slope roofs.
Codes and standards that apply
These are the model codes and standards. States and cities adopt them on their own schedule and can amend them, so your building and fire departments decide what applies.
| Rule | What it says |
|---|---|
| 2021 IRC R905.11 | Modified bitumen roofing must follow this section and the manufacturer's instructions |
| 2021 IRC R905.11.1 | Design slope not less than ¼ unit vertical in 12 units horizontal (2 percent) |
| 2021 IRC R905.11.2 | Materials must meet Table R905.11.2, which lists ASTM D6162, D6163, D6164, D6222, D6223 and D6298 membranes |
| 2021 IRC R905.11.3 | Install per this chapter and the manufacturer's instructions |
| 2021 IRC R908.3.1.1 | No recover over a water-soaked or deteriorated roof, or over two or more existing layers |
| IFC Chapter 35, 3501.1 | Welding, cutting, open torches and other hot work must comply with the chapter; "torch-applied roof system" is a defined term |
| IFC 3504.2.1 (text we read) | Fire watch during hot work and for not less than 30 minutes after |
| IFC 3504.2.6 (text we read) | At least one 2-A:20-B:C portable extinguisher within 30 feet |
The fire code text above is the 2015 Seattle Fire Code, which is based on the IFC; section numbers and times can differ in your jurisdiction's edition. Hot work permits are set in each fire code's permit section 4.
Torch-down vs other ways to apply modified bitumen
| Method | How it bonds | Open flame on the roof? | Where it fits |
|---|---|---|---|
| Torch-applied | Propane torch melts the back of the sheet | Yes | Open field areas on non-combustible or protected substrates |
| Self-adhered | Peel-and-stick backing | No | Flashings, edges, wood decks, occupied homes 7 |
| Cold-applied | Solvent or water-based adhesive | No | Same as self-adhered; some cure slowly in cold weather |
| Hot-mopped | Hot asphalt from a kettle | Kettle on site, not a hand torch | Larger roofs; a hot process with its own hazards |
All four are the same code family, modified bitumen under R905.11 1. For how modified bitumen compares with other low-slope coverings such as metal or single-ply membranes, see our guide to low-slope roofs; for steep roofs, see asphalt shingles.
Common misconceptions
- Myth Torch-down is its own roofing material.
- Reality It is modified bitumen applied with a torch. The same sheets can be glued, mopped or self-adhered 1.
- Myth A torch-down roof can go on a dead-flat roof.
- Reality The 2021 IRC asks for at least ¼ inch per foot of slope for modified bitumen 1.
- Myth Once the torch is off, the fire risk is over.
- Reality Fires can smolder under the surface, which is why a fire watch follows the work 4 5.
Local rules for torch-down roofing
Two sets of local rules apply. The building department enforces the roof itself, usually through its adopted edition of the IRC, sometimes with amendments. The fire department or fire marshal enforces the hot work side through its adopted fire code.
Local fire rules can be stricter than the model code. In Roselle Park, New Jersey, for example, the fire official requires a fire permit for roof torch work, bans torching in high wind, and requires the work area to be checked after completion for smoldering fires 8.
Other places may differ. Before work starts, ask your roofer which permits they will pull and whether your fire department has its own rules for roof torching.
When torch-down is the right choice
- Ask whether the roof is SBS or APP, and which ASTM standard the rolls meet.
- Ask how many plies, and whether the base sheet is torched, mopped or self-adhered.
- Ask how flashings, edges and pipes will be done, and whether any of it is flameless.
- Ask who on the crew holds torch safety training and how long the fire watch will last.
- Ask which building and fire permits they will pull.
- If Slope under ¼ inch per foot
- Then Fix the slope first; no modified bitumen meets the code there 1
- If Wood deck, attached to living space
- Then Ask about self-adhered or cold-applied sheets, or a flameless base layer 7
- If Lots of pipes, walls and edges
- Then Ask for flameless details at every flashing 7
- If Open area on a protected deck, trained crew
- Then Torch-applied can be a reasonable choice
Keep going
- Roof replacementWhen a low-slope roof needs a full tear-off
- Roof repairFixing blisters, open seams and flashing leaks
- Roof inspectionHave a pro check a membrane roof without walking it yourself
- Recover or tear-off rulesWhen a recover is allowed and when it is not
Questions about torch-down roofing
What is torch-down roofing made of?
Torch-down roofing is made of modified bitumen: asphalt mixed with a polymer and pressed around a reinforcing mat, usually polyester.
The two common polymers are SBS, a rubber-like material covered by ASTM D6164, and APP, a plastic-like material covered by ASTM D6222.
The top sheet often has mineral granules on its surface to shield the asphalt from sunlight.
Is torch-down roofing allowed by building code?
Yes, as modified bitumen roofing. The 2021 International Residential Code covers it in section R905.11, which requires a slope of at least ¼ inch per foot and membranes that meet listed ASTM standards.
The code does not ban the torch, but your fire department may require a hot work permit. Local amendments can change any of this, so check with your building department.
What is the difference between SBS and APP torch-down?
They use different polymers. SBS is a rubber-like elastomer and is made to ASTM D6164 when reinforced with polyester. APP is a plastic-like polymer and is made to ASTM D6222.
SBS sheets can be torched, mopped, glued or self-adhered depending on the product. APP sheets are most often torch-applied. Ask your roofer which standard is printed on the rolls.
Is torch-down roofing a fire hazard?
It can be during installation, because it uses an open propane flame. Fires can start at flashings, edges and pipes and smolder out of sight.
That is why the fire code requires a fire watch after hot work and why the industry runs CERTA torch safety training.
Once installed and cooled, the finished roof does not carry that installation risk.
Can torch-down roofing go on a completely flat roof?
Not under the 2021 IRC. Modified bitumen needs a design slope of at least ¼ inch per foot, which is 2 percent. A roof flatter than that needs tapered insulation or framing changes first so water can drain. Our low-slope roof page covers the slope rules for every low-slope covering in one place.
Can I install torch-down roofing myself?
No. Torch application is hot work under the fire code, often needs a fire permit, and is a leading cause of roofing fires. It belongs to a licensed roofer whose crew is trained in torch safety. If you want a flameless option on a small roof, ask a roofer about self-adhered modified bitumen instead.
Can torch-down be installed over an old roof?
Sometimes. The 2021 IRC allows a new covering over an existing one, but not when the old roof is water-soaked or deteriorated, or already has two or more layers. In those cases the old roofing comes off down to the deck. The manufacturer's instructions must also allow the recover.
How long does a fire watch last after torch-down work?
At least 30 minutes after the work ends under the model fire code text we reviewed, and the fire official can extend it. The CERTA torch safety program teaches a two-hour fire watch after torching, including during breaks. Your local fire code may set its own time, so ask the roofer what they will do.
What is CERTA certification?
CERTA stands for Certified Roofing Torch Applicator. It is a torch safety training program for workers who install polymer modified bitumen with torches.
It began in 1986 and was adopted and revised by the National Roofing Contractors Association with the Midwest Roofing Contractors Association in 2003, after insurers raised concerns about torch fire losses. Authorized trainers teach the workers.
Is torch-down the same as a rubber roof?
No. Torch-down is asphalt-based modified bitumen. People often say "rubber roof" for single-ply sheets such as EPDM, which are a different family laid with adhesive or fasteners, not a torch. SBS modified bitumen contains a rubber-like polymer, which adds to the confusion. Check the product name and ASTM standard on your quote.
Sources
- International Code Council, 2021 International Residential Code §R905.11 Modified bitumen roofing and §R908.3 Reroofing (Maryland adoption, read at UpCodes), retrieved .
- ASTM International, D6164/D6164M-26 Standard Specification for SBS Modified Bituminous Sheet Materials Using Polyester Reinforcements (scope), retrieved .
- ASTM International, D6222/D6222M-16(2023) Standard Specification for APP Modified Bituminous Sheet Materials Using Polyester Reinforcements (scope), retrieved .
- City of Seattle, 2015 Seattle Fire Code Chapter 35 Welding and Other Hot Work (based on the International Fire Code), retrieved .
- Roofing magazine, "Roofing Torch Program Reduces Fire Hazards During Modified Bitumen Application" (CERTA program), retrieved .
- National Roofing Contractors Association, "NRCA will offer CERTA class" (Sept. 23, 2025), retrieved .
- Canadian Roofing Contractors Association, "Torch Application – Guideline to mitigate rooftop fires", retrieved .
- Borough of Roselle Park Fire Prevention, "Hot Work & Roof Torch Operations – Fire Safety Requirements", retrieved .
Expert review
Written by the HyreRoof editorial team. Not yet reviewed by an outside expert. We say so rather than imply a review that has not happened; see our editorial policy.
How the numbers were checked: IRC text read at UpCodes; ASTM scopes read on the ASTM store; fire code text read in the Seattle adoption of IFC Chapter 35 (section numbers can differ by edition); no prices published under G-COST.
Suggest a correction. We fix errors and say what changed.